Replacement of an old water supply network of 25,000 meters in length with brand new water pipes according to European specifications.
An event that means better quality and more water for the citizens of these two (2) Municipalities.
This specific project was studied by the administration of Mr. Alexandris Ioannis in 2008, It was included in the Philodimos program by the administration of Mr. Mavromatis Ioannis in 2017 but was not transferred from Philodimos to the Antonis Tritsis program in order to be executed.
The administration of Mr. Tzekos Theodorou managed to achieve its transfer, so that the financing of 1,500,000 euros was not lost and today is in the happy position of announcing the signing of the contract between DEYATH, the MOD that has undertaken the monitoring of the project and the contractor company “T&T Technical and Tourist Enterprises S.A.”.
The work begins immediately with a time horizon of twelve (12) months.
The administration’s effort is to be able to obtain financing for the change of the water supply networks and the remaining units of the municipality.
